Projects

One Project Desk. From specification to delivery.

One WEYPLEX team coordinates technical questions, manufacturing selection, production scheduling, factory testing, documentation and DDP door-to-door delivery.

Share Your Project Requirements

The project comes first.

We start with the electrical duty, site conditions, standards and schedule. From there, WEYPLEX reviews suitable production options and helps turn a preliminary request into a quotation with a defined technical and commercial scope.

The proposed manufacturer is named in the quotation. Applicable certifications, test reports and warranty terms are confirmed for the quoted model.

How we move the project forward.

One continuous review, with clear decisions at each stage.

Understand the requirement

Review the SLD, ratings, load profile, installation conditions, standards and target delivery date. Identify missing information early.

Inquiry & scope

Match the manufacturing capability

Compare potential production options against the technical duty, required documents and schedule. Clarify exceptions before proposing a model.

Technical review

Confirm the evidence

Name the proposed manufacturer and model. Review certificates, laboratory scope, test reports and the inspection plan that actually apply to it.

Quotation & QA

Coordinate delivery

WEYPLEX coordinates confirmed production slots, factory testing, packing and DDP door-to-door delivery. The agreed scope, destination and schedule are confirmed for each order.

Execution

Manufacturer references

Across markets. Across duties.

Explore documented equipment applications and the questions WEYPLEX would review for a comparable project. Each reference belongs to its manufacturer; the proposed production site and project scope are confirmed in a new quotation.

International manufacturer references

United States / Data center50 MVA 161/12.47 kV

Power supply for a U.S. computing project

A 50 MVA, 161/12.47 kV transformer is listed for a U.S. computing facility phase in a manufacturer-supplied sales record.

View application notes

For a comparable inquiry

WEYPLEX would review load growth, redundancy, the 161/12.47 kV interface, loss targets and the energization schedule before proposing an equipment scope.

Discuss a similar requirement →

Source: Manufacturer-supplied sales record.

Egypt / North AfricaGrid shipment

First batch shipped for an Egypt grid project

The manufacturer reported that the first batch of power transformers for an Egyptian grid project was loaded and shipped in May 2026, with further units planned for later batches.

View application notes

For a comparable inquiry

WEYPLEX would clarify batch milestones, acceptance tests, packing requirements, shipping documents and on-site delivery responsibilities.

Discuss a similar requirement →

Source: Manufacturer news.

Tanzania / Transmission220 kV power transformer

High-voltage transformer shipped to Tanzania

A 220 kV power transformer was reported shipped to Tanzania for a transmission project.

View application notes

For a comparable inquiry

WEYPLEX would confirm the utility specification, insulation coordination, test scope, transport route and destination documentation for a 220 kV duty.

Discuss a similar requirement →

Source: Manufacturer news.

Cameroon / Utility90 kV factory testing

ENEO witnessed transformer testing

An ENEO delegation witnessed factory tests on a 90 kV power transformer in August 2026; the manufacturer reported results meeting the stated IEC and contract requirements.

View application notes

For a comparable inquiry

WEYPLEX would agree the witness points, factory test plan, acceptance criteria, report format and sign-off responsibilities before production testing.

Discuss a similar requirement →

Source: Manufacturer news.

European manufacturer references

These entries belong to partner manufacturers. Operating feedback, order records and catalogue references provide different levels of evidence; none is presented as a WEYPLEX delivery.

Greece / High-voltage grid200 MVA 400 kV

Large power transformer delivered to Greece

A manufacturer-supplied customer letter dated 27 February 2025 confirms a 200 MVA transformer at a Greek EHV substation in operation since December 2019. The letter identifies model SFZ11-200000/400. This is a manufacturer reference, not a WEYPLEX delivery.

View application notes

For a comparable inquiry

WEYPLEX would check the grid specification, 400 kV insulation requirements, impedance, short-circuit duty, transport constraints and the required factory test evidence.

Discuss a similar requirement →

Source: Manufacturer-supplied customer feedback letter.

Hungary / Industrial power85 MVA 132 kV

Transformer for a Hungarian plant

An 85 MVA, 132 kV transformer is listed for a plant in Hungary, illustrating the scale of industrial power applications in the manufacturer’s record.

View application notes

For a comparable inquiry

WEYPLEX would review the plant load profile, 132 kV connection, cooling method, losses, site conditions and maintenance access before comparing production options.

Discuss a similar requirement →

Source: Manufacturer-supplied sales record.

Portugal / Renewable generation6.6 MVA 33 kV model class

Transformers listed for a Portuguese project

The manufacturer project list records 15 SFL-6600-33 transformers for a Portuguese renewable-energy reference, with a signing date of 18 August 2025. The entry records an order reference; it does not establish commissioning.

View application notes

For a comparable inquiry

Review the inverter interface, winding voltages, losses, grid requirements and project test schedule.

Discuss a similar requirement →

Source: Manufacturer List of Key Projects.

Ireland / Transmission linesGlass insulators

Transmission-line reference in the catalogue

The manufacturer catalogue lists an Irish transmission-line reference. The supplied entry does not identify the unit models, quantities or delivery dates.

View application notes

For a comparable inquiry

Review string arrangement, mechanical load, coupling, creepage distance, site pollution and the applicable unit test documentation.

Discuss a similar requirement →

Source: Manufacturer English glass-insulator catalogue.

United Kingdom / Supply frameworkGlass insulators

Overhead-line equipment framework reference

The manufacturer catalogue lists a UK overhead-line equipment supply framework. The entry does not provide unit models, quantities or dates, and is not evidence of a particular completed installation.

View application notes

For a comparable inquiry

Confirm the required framework or utility specification and the evidence for the exact proposed unit.

Discuss a similar requirement →

Source: Manufacturer English glass-insulator catalogue.

Selected China applications

High-voltage transformers at the State Grid Zhejiang Zhiyan substation

China / Transmission

500 kV transformer at Zhiyan Substation

A manufacturer-published case describes a 500 kV power transformer deployed at State Grid Zhejiang’s Zhiyan substation for high-voltage grid service.

View application notes

For a comparable inquiry

WEYPLEX would review grid interface data, insulation coordination, short-circuit requirements, factory test scope and site transport constraints.

Discuss a similar requirement →

Source: Manufacturer-published case.

Wind power combined transformer equipment photographed at a manufacturing facility

China / Wind power

Guyuan wind base grid integration

A manufacturer-published case describes a combined transformer solution for the Guyuan 1,000 MW wind power base supporting the Ningxiang DC project.

View application notes

For a comparable inquiry

WEYPLEX would align the step-up ratio, plant output profile, grid code, harmonic limits and the interfaces between transformers and the balance of plant.

Discuss a similar requirement →

Source: Manufacturer-published case.

Modular substation equipment pictured in the Qingdao Yunrong Energy case

China / Energy storage

Qingdao shared storage project

A manufacturer-published case describes a string-type modular substation application for Qingdao Yunrong Energy’s 200 MW / 400 MWh shared storage project.

View application notes

For a comparable inquiry

WEYPLEX would check bidirectional operating duty, inverter output, harmonics, thermal cycling, substation interfaces and the required test documentation.

Discuss a similar requirement →

Source: Manufacturer-published case.

International references are drawn from manufacturer news and a supplied 2026 sales record. China photographs and descriptions come from the linked manufacturer case library. These are manufacturer references, not WEYPLEX-delivered projects. The application notes describe WEYPLEX’s review approach for comparable new inquiries; the proposed manufacturer and scope are confirmed in each quotation.

Documents that support a decision.

We help buyers ask for the evidence that matters to their project and identify which organization issues each document.

  • Model-specific technical data and drawings
  • Applicable certificates and test reports
  • Agreed inspection and acceptance requirements
  • Warranty, delivery and document responsibilities
View quality and compliance approach →
Transformer testing area at a manufacturing facility
Transformer testing at a manufacturing facility.

A useful first message can be brief.

Send a data sheet or SLD, destination, standards and target date if available. Unknown details can be clarified during review.

Share Your Project Requirements
Transformer winding equipment in production
Scroll to Top